Area of Application
Used for color-coated steel roofing, directly exposed metal roofing waterproof engineering.
Also be used for concrete roof panels, asphalt roofing and other roofing system.
Features & Benefits
Adhesion: Provide excellent adhesion to the substance, much higher than the requirements of the standard.
Ageing resistance: Excellent resistance to ultraviolet, adapt to extreme weather condition & extreme temperature.
Chemical resistance: Excellent resistance to water, salt water, mild acids, alkalis & soap water.
Heat insulation effect: Reflect most of the heat to reduce indoor temperature.
Easy of application: Ready to use, high sag resistance and high slope conditions can be used.
Eco-friendly: Water based hence non-hazardous.
Characters & Packing
Item |
Data |
Nature |
One component |
Appearence |
Liquid |
Colour |
White |
Package |
Plastic drum |
Packing Size |
20kg per drum |
Technical Information
Method of Application
Recommended dosage
It is 1.8kg/m2~2.0kg/m2 for 1.0mm. Coverage may vary depending upon the nature and texture of the substrate
and thickness of the membrane.
Construction Process
Surface Preparation→Additional layers of details→Waterproof layers of the entire area→Quality inspection &
acceptance
Construction Points
1.Surface Preparation: Clean the surfaces thoroughly, ensure the surface to be coated is without water, oil, grease,
dust, fungus and moss. Fasten the loosen firmware, burnish the rusts. Primer should be used when applied on the
rusted damaged metal roof or concrete roofs.
2.Additional layers: All joints of the vertical and horizontal such as the roots of the vents, pipe corners and
constructions with its fix part, should be treated reinforced with polyester fabrics. The fabric should be flat
without corrugations, and fully coated to adhere tightly to the substrate. Keep no folds and edge warp.
3.Waterproof layers: For the entire area, waterproof coating should be applied in at least three times. After the first
brushing, added the reinforced polyester cloth and fully immersed in the liquid coating, then brush a second
coating, when curing apply the last time construction. You can add a small amount of water to dilute the coating
and then brush the last time, to improve the flatness and smooth finish on the surface of the coating. The
construction interval is generally 12h, each time the film thickness should be 0.5-0.7mm, and the brushing
direction should be vertical to the previous one.